Drill Components

COMPONENTS

Available for retrofit applications and as optional components on new rigs. We can customize each component to suit retrofit applications as needed per your application.

High torque micropiling drill head

JT200 DRILL HEADS

High torque drills speeds ranging from 2,020 ft.lbs to over 9,580 ft.lbs (2,700 - 13,000 Nm). Optional air swivel available, rated for 2,500 PSI.

See specs
JT200 Series Drill head

M-SERIES HIGH SPEED HEADS

Powerful rotation heads with drill speeds ranging from 32-204 RPM. Torque from 1,475 ft.lbs to over 6,400 ft.lbs (2,000 - 8,700 Nm). Optional swivel available.

See specs
Drill rig remote controls

REMOTE CONTROLS

Wireless remote control packages available on new rigs, included spool controls and solenoids for remote, safe operation of drilling rig or mast unit.

See specs
Geothermal Drilling Breakout Clamps

SAFETY CLAMPS

Hands-Free Safety Clamps utilize bottom breakout wrenches, auger holder plate and top twist clamp system to grip drill rods and casings for various applications.

See specs
Double Breakout Drill Clamps

DOUBLE BREAKOUT CLAMPS

Double Breakout Casing Clamps are available optional on new rigs or as a retrofit component for existing drilling units. See specifications page for more information.

See specs
Clam Clamps with breakout wrenches

STANDARD CLAM CLAMPS

Included as standard on our rigs, the clam clamps utilize slip guides to accommodate various rod and casing sizes. Includes dual breakout wrenches.

See specs
Mast Extension and hydraulic winch package

WINCH & MAST EXTENSION

A mast extension and 2,200 lbs line pull planetary winch with mounting plate and spool control lever section. Also available for retrofit applications on existing machines.

See specs
Colloidal Grout Mixer for bentonite geothermal grout

GROUT UNITS

The G20 Grout Mixer & Pump is a 65 gallon colloidal mixer with continuous pumping at 45 gallons per minute. Powered by a 24HP honda engine.

See specs

Drilling Solutions for your Industry

We have been helping contractors increase project efficiency for over 30 years